Civil Engineering

Analysis of Disturbance Influence of Different Shield Crossing Forms of Soft Soil on Existing Tunnel

Expand
  • 1. Department of Civil Engineering, Shanghai University, Shanghai 200072, China; 2. Shanghai Tunnel Engineering Co., Ltd., Shanghai 200062, China

Received date: 2013-10-12

  Online published: 2014-10-30

Abstract

Based on an actual soil layer of tunnel overlapping section of Shanghai Metro, a 3-D finite element method is used to simulate the excavation process of three crossing forms of new tunnels, including crossing from upper and under of an existing tunnel, under crossing from an existing tunnel, and upper crossing from an existing tunnel. Settlement of the existing tunnel of each crossing form is analyzed. A reasonable measure is given to control settlement of the existing tunnel in each crossing form. The results show that there is not only deformation but also torsion of circular section of the existing tunnel. The key of a new tunnel crossing an existing tunnel from upper and under is to control the maximum settlement during the excavation process instead of final status settlement value of the existing tunnel. The key of a new tunnel under crossing an existing tunnel is to control the final status settlement curve of the existing tunnel. The key of a new tunnel upper crossing an existing tunnel is to control the floating upwards of the existing tunnel. Reliability of the numerical simulation is verified by comparison between the measured and simulated data. The results of this research provide a basis for choosing the form for a
new tunnel crossing an existing tunnel, constructing new tunnels, and protecting existing tunnels.

Cite this article

WANG You-cheng1, ZHANG Meng-xi1, LI Lei1, WU Hui-ming2, ZHANG Xiao-qing1 . Analysis of Disturbance Influence of Different Shield Crossing Forms of Soft Soil on Existing Tunnel[J]. Journal of Shanghai University, 2014 , 20(5) : 573 -585 . DOI: 10.3969/j.issn.1007-2861.2014.01.019

References

[1] 孙钧, 刘洪洲. 交叠隧道盾构法施工土体变形的三维数值模拟[J]. 同济大学学报: 自然科学版, 2002, 30(4): 378-385.

[2] Addenbrooke T I, Potts D M. Twin tunnel interaction: surface and subsurface effects [J]. International Journal of Geomechanics, 2001, 1(2): 249-271.
[3] 张海波, 殷宗泽, 朱俊高. 近距离叠交隧道盾构施工对老隧道影响的数值模拟[J]. 岩土力学, 2005, 26(2): 282-286.

[4] 张连凯, 张海波, 李刚. 长距离叠交隧道施工过程三维有限元模拟研究[J]. 力学季刊, 2005, 26(3): 416-422.

[5] Chehade F H, Shahrour I. Numerical analysis of the interaction between twin-tunnels: influence of the relative position and construction procedure [J]. Tunneling and Underground Space Technology, 2008, 23(2): 210-214.

[6] 宁寅, 冯伟, 马永其, 等. 下穿已有隧道泥水盾构施工的预测分析[J]. 上海大学学报: 自然科学版, 2012, 18(4): 401-407.

[7] 杨宇恒, 廖少明, 范垚垚, 等. 盾构上、下夹穿运营地铁的变形预测与对比分析[J]. 岩石力学与工程学报, 2011, 30(3): 4072-4077.

[8] 房明, 刘镇, 周翠英, 等. 新建隧道盾构下穿施工对既有隧道影响的三维数值模拟[J]. 铁道科学与工程学报, 2011, 8(1): 67-72.

[9] 肖潇, 张孟喜, 吴惠明, 等. 多线叠交盾构施工引起土体变形数值模拟分析[J]. 地下空间与工程学报, 2011, 7(5): 884-889.

[10] Lee K M, Rowe R K. Finite element modeling of the three-dimensional grounded formations due to tunneling in soft cohesive soils Part-Method of analysis [J]. Computers and Geotechnics, 1990, 10(4): 87-109.

[11] 范垚垚. 盾构超近距离穿越运营地铁的微扰动施工研究[D]. 上海: 同济大学, 2008.

[12] 廖少明, 杨俊龙, 奚程磊, 等. 盾构近距离穿越施工的工作面土压力研究[J]. 岩土力学, 2005, 26(11): 1727-1730.