Civil Engineering

Test of Shear Capacity of Pre-stressed High-Strength Concrete Pipe Piles

Expand
  • 1. Department of Civil Engineering, Shanghai University, Shanghai 200072, China; 
    2. East China Architectural Design and Research Institute Co., Ltd., Shanghai 200002, China

Received date: 2012-02-20

  Online published: 2012-12-28

Abstract

Tests on shear capacity of the pre-stress high-strength concrete (PHC) AB400(80) pipe piles were carried out, without axial force and under an axial forces of 1 300 kN, respectively. The loading devices and testing method were introduced first in this paper. The cracking and ultimate shear capacities of PHC-AB 400(80) were obtained with and without the axial forces. The failure process during shearing was studied based on the observation of crack development and an analysis of the maximum principal stress and its angle of concrete in the shear span section. Comparison between the values of shear capacity calculated according to the Standard of Pre-stressed Concrete Pipe Pile and from the test results shows that the former is about 58% of the later. The role of stirrup should be taken into account in the formula for calculating the shear capacity of PHC pipe piles.

Cite this article

LOU Zhi-jun, WU Jiang-bin, SONG Qing-jun, SUN De-an . Test of Shear Capacity of Pre-stressed High-Strength Concrete Pipe Piles[J]. Journal of Shanghai University, 2012 , 18(6) : 645 -650 . DOI: 10.3969/j.issn.1007-2861.2012.06.018

References

[1]石振明,陈建峰,祝龙根.PHC管桩动力特性试验研究[J].岩土力学,2004,25(10):1622-1626.

[2]张忠苗,刘俊伟,邹健,等.加强型预应力混凝土管桩抗弯剪性能试验研究[J].浙江大学学报:工学版,2011,45(6):1074-1080.

[3]张星宇,柳炳康,凌应轩,等.预应力混凝土管桩与承台结合部抗剪承载力的试验研究[J].建筑结构,2008,38(4):11-14.

[4]王钰,林军,陈锦剑,等.软土地基中PHC管桩水平受荷性状的试验研究[J].岩土力学,2005,26(S):39-42. 

[5]柳炳康,李建宏,张星宇,等.预应力填芯管桩抗弯性能与延性特征的试验[J].工业建筑,2007,37(03):46-50. 

[6]洪涛.水平荷载作用下预应力混凝土管桩受力性状的分析[D].合肥:合肥工业大学,2008.

[7]凌应轩.预应力混凝土管桩填芯混凝土抗剪试验研究及理论分析[D].合肥:合肥工业大学,2006. 

[8]马志涛.现浇混凝土薄壁管桩水平受力特性试验研究与分析[D].南京:河海大学,2007.

[9]中国建筑标准设计研究院.10SG409预应力混凝土管桩图集[S].北京:中国计划出版社,2010.

[10] DBJT08-92-2000先张法预应力混凝土管桩[S].上海,2000.
Outlines

/