Influences of the water conservancy revetment structure construction to the adjacent underground raw water pipeline
Received date: 2016-05-20
Online published: 2016-12-30
蔡育 . 水利护岸结构施工对临近地下已有原水管线的影响[J]. 上海大学学报(自然科学版), 2016 , 22(6) : 821 -828 . DOI: 10.3969/j.issn.1007-2861.2016.05.014
Combined with the 2nd Da Lu waterway regulation project, water conservancy revetment constructions on the existing adjacent underground water supply pipelines were investigated. Besides the squeezing soil effect of the piles, the project also influenced the settlement of the structure and soil vibration, pre-drilling hole collapse, change of upper load, and so forth. To reduce the influence, some measures were taken, including in situ monitoring, control of sink rate of pile, and seperate pilling of neighboring pile foundations, restrictions on piling quantity, pre-drilled piling, considering the front pile curtain effect,
and pre-borehole wall protection. The practice results showed that these measures were effective and could be used for the similar projects.
[1] 王广平. 沉桩挤土效应分析及克服挤土效应的措施[J]. 城市道桥与防洪, 2008(6): 165-168.
[2] 胡伟, 黄义, 唐亮. 沉桩扩孔速率对非饱和土中柱形扩孔挤土效应的影响[J]. 应用力学学报, 2009, 26(2): 370-374.
[3] 王兴龙, 陈磊, 窦丹若. 打桩挤土的现场试验研究及土体位移的计算公式[J]. 岩土力学, 2003(S2): 175-179.
[4] 王育兴, 孙钧. 打桩施工对周围土性及孔隙水压力的影响[J]. 岩石力学与工程学报, 2004(1): 153-158.
[5] 姜朋明, 尹蓉蓉, 胡中雄. 打桩引起土体位移的计算分析[J]. 江苏科技大学学报(自然科学版), 2000(2): 19-22.
[6] 高玲. 大规模打桩挤土对地下埋管的影响及防护初探[J]. 中国建材资讯, 2006(1): 62-65.
[7] 龚先兵. 单桩沉桩引起的初始超孔隙水压力及其消散的计算[J]. 长沙理工大学学报(自然科学版), 2009(6): 39-43.
[8] 李波, 栾茂田. 基于SMP 破坏准则的柱形孔扩张问题理论分析[J]. 大连理工大学学报, 2006(2): 246-251.
[9] 饶平平, 王道远. 基于广义Lade-Duncan 准则的圆柱孔扩张问题分析[J]. 地下空间与工程学报, 2012(5): 946-950.
[10] 郑绍欢, 曾海霞, 王莉. 静力压桩挤土应力场数值模拟[J]. 山西建筑, 2012, 38(9): 63-65.
[11] Elisabeth T B, Kenichi S. Mechanisms of setup of displacement piles in sand: laboratory tests [J]. Canadian Geotechnical Journal, 2005, 42(5): 1391-1407.
[12] 计宏, 卢文晓. 静压桩挤土扩孔的有限元数值模拟研究[J]. 西安科技大学学报, 2009, 29(6): 722-725.
[13] 朱奎. 减少沉桩施工对周围环境影响措施分析与讨论[J]. 建筑技术, 2004(3): 175-176.
[14] 饶平平, 李镜培, 张常光. 预钻孔对临近斜坡沉桩挤土影响分析[J]. 岩土力学, 2012, 33: 155-161.
[15] 徐哲, 孙菁, 蔡育. 大芦线航道整治二期工程(闵行浦江段)初步设计报告[R]. 上海: 上海勘测设计研究院, 2012.
/
| 〈 |
|
〉 |